- DIN EN 61439
- DIN EN 60204-1
What we do
- Assembly and wiring of control and machine cabinets to your circuit diagram
- Modification and extension of existing control systems, for instance when retrofitting a machine
- Fault finding in control systems when a plant stops intermittently and nobody knows why
- Routine verification to DIN EN 61439 with a report
- Documentation: bringing the circuit diagram up to date, labelling terminals and equipment
Who it is for
Small and medium-sized businesses, workshops, machine builders without their own cabinet building. Businesses that are converting a machine and have no electrical department for it.
Why the documentation is the real value
A control cabinet is wired quickly. The difference shows years later, when somebody else is looking for a fault. That is why you get the diagram back in its updated state, with the changes actually made during assembly. Not the diagram we started with.
What you receive
- Assembly and wiring according to the circuit diagram
- Routine verification to DIN EN 61439 with a report
- Terminal and equipment labelling
- The circuit diagram in its updated version
Prices
What this service costs
On-site labour
Final prices, no VAT charged under the German small business scheme. Billed per hour.
| Service | Price per hour |
|---|---|
| On-site labour | 68,00 € |
| Minimum order value | 68,00 € |
| Travel beyond 15 km | 0,90 € / km |
- No VAT is charged (small business scheme under Section 19 of the German VAT Act). The amount shown is the final amount.
- Billed in quarter-hour increments; part quarter hours are rounded up.
- Materials are charged as incurred and agreed beforehand.
- For plannable work we quote a fixed price in advance.
- Travel within a 15 km radius is free of charge, beyond that 0.90 € per kilometre.
FAQ
Questions about this service
Do you also build to circuit diagrams from elsewhere?
Yes, that is the normal case. You supply the diagram, we build and wire. If something strikes us along the way that will not work as drawn, we report it before assembly and not after the first power-up.
Can you extend an existing cabinet?
For control and machine cabinets yes, provided space and protection allow it. That does not include distribution boards forming part of the customer installation within the meaning of the German low voltage connection ordinance, nor anything at the meter panel.
Is the cabinet tested before handover?
Yes. Routine verification to DIN EN 61439 is part of the work: visual inspection, protective conductor continuity, insulation resistance, function of the built-in equipment. The report belongs with the installation documentation.
Do I get usable documentation?
This matters enough to us to mention it: an updated circuit diagram, a terminal diagram, equipment labelling inside the cabinet and as a file. A control cabinet that nobody understands in five years is an expensive problem.
Next
Often combined with
Installation repair
Whatever is broken gets repaired or replaced: sockets, switches, luminaires, motion detectors. Maintenance of what is there, without rebuilding the installation.
- DIN VDE 0105-100
- BetrSichV
Hourly rate68,00 €Fixed installations
Distribution boards, circuits, permanently connected devices and RCDs. The installation itself is tested, not only what hangs off it.
- DGUV Vorschrift 3
- DIN VDE 0105-100
- DIN VDE 0100-600
from per unit24,00 €
A quote for your equipment
Tell us the types of device and the quantity, and you get a fixed price, not an estimate with a surcharge later.
Reply within one working day