Skip to content

Service

Connecting electrical devices

New device delivered, but nobody is allowed to connect it? We connect to existing supply points, test, and brief you.

  • DIN VDE 0100-600
  • DIN VDE 0701-0702

What we do

You have bought a new device. There it stands, the box is open, and nobody in the building wants to take responsibility for connecting it. That is exactly what this appointment is for.

  • Connection to the existing supply point, whether plug connection or permanent connection
  • A test before first use, as required by the German Ordinance on Industrial Safety and Health
  • Inclusion in your device documentation with a label and the next due date
  • A briefing on the points that matter for safety: emergency stop, protective devices, what to do in the event of a fault

For medical devices, the briefing under the German Medical Devices Operator Ordinance is added, in so far as it follows on from the technical side. The application-related briefing remains a matter for the manufacturer.

Who it is for

Practices and studios that regularly acquire new devices. Catering and hotels replacing kitchen equipment. Workshops and offices replacing machines or technology.

What we do not take on

If a supply point has to be created for your new device first, meaning a new supply cable, a dedicated circuit or a change in the distribution board, that lies outside our scope. We tell you so when you enquire, so that you do not arrange the appointment for nothing.

What you receive

  • Proper connection to the existing supply point
  • Functional and safety test with a report
  • A test label and inclusion in your schedule of due dates
  • A short briefing on the safety-relevant points

Prices

What this service costs

On-site labour

Final prices, no VAT charged under the German small business scheme. Billed per hour.

Price scale On-site labour, final prices, no VAT charged, per hour
Service Price per hour
On-site labour 68,00 €
Minimum order value 68,00 €
Travel beyond 15 km 0,90 € / km
  • No VAT is charged (small business scheme under Section 19 of the German VAT Act). The amount shown is the final amount.
  • Billed in quarter-hour increments; part quarter hours are rounded up.
  • Materials are charged as incurred and agreed beforehand.
  • For plannable work we quote a fixed price in advance.
  • Travel within a 15 km radius is free of charge, beyond that 0.90 € per kilometre.

FAQ

Questions about this service

What does "to existing supply points" mean?

The supply point is already there: a socket, a cooker connection, a supply cable with suitable protection. We connect the device to it properly, test and document. If a new supply point has to be created first, a firm entered in the installer register is responsible.

Why not simply plug it in ourselves?

With a device on a standard plug you can. For permanently connected devices, for three-phase supplies and for anything applied to people, connection by a qualified electrical specialist (Elektrofachkraft) is the safe route. A test before first use is required in any case.

Does the new device get a test label straight away?

Yes. We carry out the test before first commissioning at the same appointment. The device goes straight into your ongoing documentation with a report, a label and an entry in the schedule of due dates.

Next

Often combined with

  • Portable equipment

    Everything you can plug in and carry away: extension leads, power supplies, devices in the treatment room, office and workshop. Tested, recorded, given a due date.

    • DGUV Vorschrift 3
    • DIN VDE 0701-0702
    • BetrSichV
    from per device5,90 €
  • Installation repair

    Whatever is broken gets repaired or replaced: sockets, switches, luminaires, motion detectors. Maintenance of what is there, without rebuilding the installation.

    • DIN VDE 0105-100
    • BetrSichV
    Hourly rate68,00 €

A quote for your equipment

Tell us the types of device and the quantity, and you get a fixed price, not an estimate with a surcharge later.

Reply within one working day